High-efficiency power modules and smart connectivity for the future of mobility.
As the global automotive landscape pivots toward 800V architectures and ultra-fast charging capabilities, the demand for high-performance CCS (Combined Charging System) DC Fast Chargers has transcended basic functionality. Modern procurement for global enterprises now focuses on Information Gain: the ability of a charging station to not only deliver power but to manage thermal loads, communicate via ISO 15118, and integrate with Smart Grid protocols.
In the wholesale market, choosing a CCS DC Fast Charging manufacturer involves auditing their E-E-A-T credentials. It is no longer just about the hardware; it is about the Expertise in power electronics, the Authoritativeness in international certifications (CE, UL, TUV), and the Trustworthiness of a 20+ year supply chain.
Tongxing New Energy Technology stands at the forefront of this evolution, leveraging 23 years of energy sector mastery to provide localized compliance and robust supply chain advantages that domestic manufacturers in Europe or North America often struggle to match in terms of scale and speed-to-market.
A National High-Tech Enterprise Pioneering Smart Charging Solutions
Equipped with 18 automated assembly lines and IoT-enabled quality control systems, achieving a 95% production automation rate for consistent high-quality output.
140+ certified engineers, 20+ R&D specialists in power electronics, and a 40-member ISO-9001 audit team ensure every unit meets rigorous standards.
From circuit topology optimization to OCPP 1.6J/2.0 protocol development and thermal management systems, we control the entire IP stack.
IP55/IP65 certified. Engineered to perform from -35°C to 75°C with military-grade materials for waterproof and dustproof reliability.
Seamless payment gateway integration, real-time solar energy allocation, and remote monitoring via proprietary cloud-based management platforms.
Support for up to 960kW ultra-fast charging, capable of adding 300km of range in just 10 minutes for next-gen EV platforms.
Why Global Procurement Directors Choose Tongxing
Located in China's primary energy cluster, we have direct access to raw materials (lithium, copper, advanced semiconductors) which reduces lead times by 40% compared to international competitors.
Economies of scale allow us to offer 180kW-360kW DC chargers at prices that enable faster ROI for CPOs (Charge Point Operators) without sacrificing component quality.
Our modular hardware design allows for custom branding, localized UI languages, and specific connector configurations (CCS1, CCS2, GBT) within a 4-6 week production window.
Integrated Photovoltaic-Energy Storage-EV Charging Solution
| Indicator | Traditional Solution | Integrated Solution | Improvement |
|---|---|---|---|
| PV Self-Consumption Rate | 50% | 85%+ | ↑ 70% |
| Comprehensive Electricity Cost | 0.85 USD/kWh | 0.62 USD/kWh | ↓ 27% |
| Annual Carbon Emission Reduction | - | 40%-60% | Significant |
Ensuring Seamless Integration into Regional Power Grids
Our CCS DC chargers are designed to meet the specific harmonics and safety requirements of different regions. This includes CE/EN 61851-1 for Europe and UL 2202 standards for North America. We provide all necessary documentation for local grid connection approvals.
Full compatibility with global backend platforms (e.g., Greenlots, ChargePoint, Hubject). This allows for remote diagnostics, dynamic load management, and over-the-air (OTA) updates to adapt to new EV protocols.
We partner with local certified installers and provide 24-month warranties with lifetime technical support. Our modular design means "plug-and-play" component replacement, minimizing downtime at commercial stations.
High-duty cycle charging for electric vans and trucks, utilizing scheduled charging to minimize peak grid fees.
Attract high-spending EV owners with 120kW-180kW rapid charging while they shop, integrated with loyalty payment apps.
Ultra-fast 360kW+ stations with liquid-cooled cables to handle the highest turnover rates on major transit corridors.
Expert Insights into CCS DC Charging Procurement
CCS1 (Type 1) is the standard for North America and parts of Korea, featuring a latching mechanism. CCS2 (Type 2) is the standard for Europe, Australia, and South America. As a manufacturer, we provide both configurations and can produce dual-connector stations to serve diverse fleet requirements.
Our intelligent AI algorithms detect the state of charge (SoC) and maximum intake rate of each connected vehicle. If two cars are charging, the station can split power (e.g., 180kW into 90kW+90kW or 120kW+60kW) to ensure optimal charging speed for both without tripping the circuit breaker.
Yes. Our "Integrated Photovoltaic-Energy Storage-Charging" solution uses a DC-coupled architecture to minimize conversion losses. The charger can prioritize "Green Power" from the solar inverter or energy storage system before drawing from the grid.
Typically, standard models have a lead time of 15-25 days. Custom OEM orders (branded casing, specific software integrations) take approximately 30-45 days. We handle the logistics and shipping to 45+ countries, ensuring DDP or CIF terms based on your preference.
Our units are designed for a 10-15 year service life. Maintenance is minimal due to the IP65 rating, usually requiring only an annual filter check and connector inspection. Remote diagnostics through OCPP significantly reduce the need for on-site technician visits.
From Residential Wallboxes to Industrial Energy Hubs