Wholesale Outdoor EV Charger Manufacturer & Supplier

Driving Global Electrification with Smart Infrastructure, High-Performance Engineering, and Sustainable Energy Ecosystems.

TONGXING NEW ENERGY: 23 Years of Power Engineering Excellence

As a certified national high-tech enterprise, Tongxing New Energy Technology Co., Ltd. has established itself as a global vanguard in the development of robust, outdoor-rated EV charging infrastructure. Leveraging over two decades of technical expertise, our R&D initiatives focus on the intersection of power electronics, IoT connectivity, and renewable energy integration.

23+Years Industry Experience
72k m²Smart Manufacturing Base
45+Countries Exported
98.6%Field Reliability Rate

Technical Roadmap & Future Outlook (2024-2030)

High-Voltage 800V Architecture

Transitioning from traditional 400V systems to 800V liquid-cooled ultra-fast charging, reducing charging times to under 10 minutes for a 400km range.

🔄

V2X & Bi-directional Charging

Implementing Vehicle-to-Grid (V2G) and Vehicle-to-Home (V2H) protocols, allowing EVs to serve as mobile energy storage units for grid stabilization.

🧠

AI-Driven Energy Dispatch

Proprietary algorithms that predict grid load and optimize energy distribution between PV, Storage, and Charger units in real-time.

Macro Industry Solutions: Integrated Energy Ecosystems

Full-Scenario Energy Transformation

Modern outdoor EV charging is no longer about isolated hardware; it's about the "Solar-Storage-Charging" (SSC) synergy. Our solutions bridge the gap between volatile renewable generation and high-demand EV loads.

Strategic Scenario Core Technology Components Economic Value Proposition
Urban Commercial Hubs High-power DC Matrix + Smart Load Management Reduces peak demand charges by 35% through AI throttling.
Industrial Logistics Parks Megawatt-scale PV + Containerized BESS + Ultra-Fast DC Achieves energy self-sufficiency; lowers TCO for fleet operators.
Remote/Rural Microgrids Off-grid Solar Arrays + Hybrid Inverters + AC/DC Chargers Reliable charging in zero-grid infrastructure zones.

China Factory 4.0: Supply Chain Resilience

Our manufacturing facility in China serves as a global hub for innovation, utilizing Industry 4.0 standards to ensure quality at scale. 18 automated assembly lines and IoT-enabled quality control systems achieve a 95% automation rate, ensuring that every unit—from a 7kW home box to a 960kW industrial station—meets rigorous international standards.

  • 🚀 Vertical Integration: In-house PCB design and cabinet fabrication.
  • 🛡️ Quality Assurance: 40-member ISO-9001 audit team with 100% burn-in testing.
  • 📦 Logistics Efficiency: Strategic proximity to major ports for rapid global deployment.
Tongxing Factory

Localization Support & Global Compliance

🌍

Certification Sovereignty

Full compliance with CE, IEC, UL, and GBT standards. We ensure your infrastructure meets local grid codes and safety regulations in 45+ jurisdictions.

🛰️

White-Label Branding

Custom industrial designs and UI/UX software localization to align with your corporate identity and regional language requirements.

🔧

Local O&M Support

24-month comprehensive warranty and lifetime technical support via a distributed network of certified service partners.

Solving Global Procurement Challenges

For global enterprises, procuring EV charging hardware is a decision involving Total Cost of Ownership (TCO). Our wholesale model focuses on three key pillars of procurement success:

1. Interoperability: Using OCPP 1.6J/2.0 protocols, our hardware integrates seamlessly with any third-party Charge Point Management System (CPMS), preventing vendor lock-in.

2. Climate Resilience: Outdoor hardware must survive. Our IP55/IP65 units are tested from -35°C to 75°C, featuring military-grade materials for UV and corrosion resistance.

3. Scalability: Modular power stacks allow operators to increase charging capacity as their fleet grows without replacing the entire infrastructure.

Frequently Asked Questions

Q: What is the lead time for wholesale orders?

A: Standard orders are processed within 15-20 days. Custom white-label or large-scale DC projects typically require 30-45 days depending on component complexity.

Q: Do your chargers support Dynamic Load Balancing (DLB)?

A: Yes, our AC and DC units both support DLB, allowing stations to share power between multiple vehicles safely without overloading the building's main supply.

Q: Can your software integrate with existing solar systems?

A: Our chargers are designed for the SSC ecosystem. Through our energy management layer, we can prioritize solar-generated power for the EV charging cycle.

Q: What safety protections are included?

A: Every unit features over-voltage, under-voltage, short-circuit, over-temp, and RCD Type B leakage protection as standard.